Asbestos Removal From interior and exterior of abandoned House

    Project Date:

Project Completion At: Wyong, Australia

Project Date: 15th November 2024

Project Summary:

Asbestaway and team undertook the challenging task of removing asbestos-containing materials from both the interior and exterior of an abandoned house in Wyong, Australia. The project was completed in just two days, despite the extreme heat, with temperatures reaching 38°C outside and nearly double that inside the asbestos suits. To ensure safety and compliance with Safe Work NSW, additional personnel were brought in, scaffolding was erected for high areas, and all asbestos was kept wet to minimize dust. Regular hydration and breaks were crucial to maintain energy. The team’s adaptability and professionalism led to the successful completion of the project, finishing half a day ahead of schedule.

Why The Client Needs Asbestaway’s Asbestos Removal Services?

Clients need Asbestaway’s asbestos removal services for several key reasons. Asbestos is a hazardous material that poses serious health risks, including respiratory diseases and cancers. Asbestaway specializes in safely removing asbestos from both residential and commercial properties, ensuring full compliance with regulations like Safe Work NSW. Their expertise, professional equipment, and strict safety protocols guarantee a thorough and risk-free removal process. Asbestaway’s team works efficiently, ensuring minimal disruption while delivering high-quality results.

Reasons Clients Need Asbestaway’s Services:

  • Safe and efficient asbestos removal for health protection.
  • Compliance with Safe Work NSW regulations.
  • Experienced and trained personnel handling hazardous materials.
  • Use of advanced equipment to minimize risk and ensure thorough removal.
  • Fast and reliable service with minimal disruption to property.
  • Proper disposal of asbestos materials in line with environmental guidelines.
  • Expertise in both interior and exterior asbestos removal.
  • Proven track record of completing projects ahead of schedule.

How Abestaway Solutions Helped Customer?

Asbestaway Solutions provided critical assistance to the customer by efficiently and safely removing asbestos-containing materials from an abandoned house in Wyong. The team’s expertise ensured that the hazardous material was removed in full compliance with Safe Work NSW regulations, preventing potential health risks to the property’s future occupants. Despite extreme heat conditions, with temperatures reaching 38°C outside and almost double that inside the protective suits, Asbestaway’s team adapted by increasing personnel, erecting scaffolding for hard-to-reach areas, and regularly wetting down the asbestos to minimize dust. The team maintained hydration and took regular breaks, ensuring high productivity and safety throughout the process. Their fast and methodical approach allowed for the successful completion of the project half a day ahead of schedule. The customer was assured of a professional, high-standard removal that met all health and safety requirements, and the property was left free from asbestos, ensuring a safer environment for future use.

Some Glimpses Of Asbestos Removal Project Completion Of Interior and Exterior of Abandoned House

Asbestos Removal From interior and exterior of abandoned House

 

Client’s Feedback

I am so happy with the work Asbestaway did on my property. The team was incredibly professional and efficient, completing the asbestos removal ahead of schedule despite the extreme heat. They made sure to follow all safety regulations, minimizing dust and ensuring the property was thoroughly cleared of hazardous materials. I really appreciated their attention to detail and the care they took throughout the process. Thanks to their hard work, I now feel confident that my property is safe and asbestos-free. I couldn’t be more pleased with the results!