Project Location: Tenambit
Project Date: 15/06/2025
Project Summary:
Asbestaway Pty Ltd completed a professional and fully compliant asbestos removal project in Tenambit, NSW, adhering to all SafeWork NSW regulations and the “Code of Practice: How to Safely Remove Asbestos 2019” (Part 3.10). The scope involved the removal of approximately 70–80 square metres of bonded asbestos eaves from around the entire house. This included 17 sheets, each measuring 3m x 1.5m, primarily located across the front of the property. A mobile scaffold was used to ensure safe and efficient access throughout the job. Upon completion, the site was thoroughly decontaminated, and an independent hygienist issued the legally required Asbestos Clearance Certificate for works exceeding 10 square metres. The project was delivered safely, efficiently, and in full compliance with regulatory standards.
Why The Client Needs Asbestaway’s Asbestos Removal Services?
The client required asbestos removal services to ensure the safe and legal removal of asbestos-containing eaves before scheduled renovation works could begin. Asbestaway Pty Ltd was chosen for our proven track record in compliant asbestos removal, adherence to SafeWork NSW regulations, and ability to deliver clean, certified results with minimal disruption. Our professional approach, use of proper equipment, and timely execution enabled the client’s builder to commence work immediately after clearance—demonstrating the importance of engaging a licensed and experienced asbestos removal contractor.
Key Project Highlights:
- Full compliance with SafeWork NSW and Code of Practice 2019 (Part 3.10)
- Removal of approx. 70–80 sqm of bonded asbestos
- 17 asbestos sheets (3m x 1.5m) removed from front and eaves
- Use of mobile scaffold for safe, efficient access
- Issuance of Asbestos Clearance Certificate by independent hygienist
- Site prepared promptly for follow-on construction works
How Abestaway Solutions Helped Customer?
Asbestaway Solutions provided the customer with a streamlined, end-to-end asbestos removal service tailored to fit within a tight project timeline. From the initial site preparation to the final clearance process, our team managed every aspect of the job with precision and professionalism. By coordinating with both the client and the builder, we ensured minimal disruption and maximum efficiency. Our experienced crew worked methodically to dismantle and remove the asbestos-affected materials while maintaining a strict safety perimeter.
The use of appropriate access tools, such as mobile scaffolding, allowed us to work safely at height and avoid unnecessary delays. Our thorough internal quality checks ensured the site was cleared to the highest standard before third-party hygienist verification.
Through proactive communication, adherence to legal obligations, and a focus on health and safety, Asbestaway enabled the client to proceed confidently with their construction plans, knowing the asbestos risk had been expertly handled and fully resolved.
Some Glimpses Of Asbestos Removal Project Completion
Clients Feedback
Customer was extremely happy as her builder could now begin his scope of works the following morning, thanks to the excellent clean-up job completed by the team. The hygienist issued the Asbestos Clearance Certificate, as required by law for removals over 10 square metres, confirming everything was done to a high standard. The work was carried out professionally, safely, and with great attention to detail. Well done to Anthony and the team from Asbestaway Pty Ltd for delivering a smooth, compliant, and efficient result.